

Newtecons is undertaking the structural works and core-and-shell finishing for High-Rise Blocks OCC2, DV2.2, and DV2.4, comprising 5 towers with a scale of 3 basement levels, 2 podium levels, and 38 upper stories. The development is designed to feature residential apartments, serviced apartments, and commercial retail space. The total construction floor area (CFA) is approximately 246,390 m², with a targeted construction duration of 557 days from the commencement date.

The project presents significant engineering challenges:
Particularly the execution of 3 deep basement levels under complex coastal geological conditions subject to high groundwater tables. This demands a General Contractor with extensive field experience, disciplined scientific organization, and tailored technical solutions to guarantee structural stability and site safety.
Leveraging extensive experience in mega-project delivery and proven execution capability:
Newtecons will collaborate closely with partners and the Developer to execute the project on schedule, ensuring stringent quality and safety standards. This contribution helps realize Sun Group’s development vision, creating a new architectural landmark for the coastal city of Vung Tau.


Situated in the Dong Anh – Co Loa area, the development occupies a strategic location along key arterial transportation corridors within an area designated as the new growth center of the Capital. With synchronized infrastructure and distinctive landscape advantages, the project connects directly with green ecosystems, major lakes, and the Co Loa Cultural & Historical Park.

Newtecons Building,
96 Phan Dang Luu,
Duc Nhuan Ward,
Ho Chi Minh City
67A Truong Dinh,
Tuong Mai Ward,
Hanoi City